Build Season

2019 Build - Day 24: In which the machines take over (docking)

We’re still chugging away at getting the prototype climber built. Initial testing showed promise, but the geometry needs to be tweaked a little. The elevator and intake team has also finished mounting the elevator on our test chassis and will be installing the intake in the coming days. Once that’s done and tested, we’re going to prep material for manufacture. This year, we’re going to be a little more organized and prepare a “cut-list” of pieces so that multiple people can work on fabrication.

2019 Build - Days 8 - 20: More Prototyping

This season, we’ve been dedicating a lot more time to prototyping and CAD-ing different mechanisms, and making said prototypes out of wood/PVC pipe. This has given us a tremendous improvement in figuring out critical dimensions, and a way to visualize how stuff fits together. We’ve spent the last 2 weeks refining different methods for grabbing and controlling the game pieces, and are pretty close to having a final design done!